Marca: WHIRLPOOL
Stock: 10
Whirlpool FFWDB864349BVEE Washer Dryer 8 kg / 6 kg 1400 RPM — Genuine WHIRLPOOL product supplied by DistriNode.Available with live stock, verified pro..
Capacità nom...
8 kg
Numero massi...
1400 RPM
482,20 €
IVA esclusa:395,25 €
Marca: WHIRLPOOL
Stock: 4
TEMPERATURE ALARMDesigned for your peace of mind.The Temperature alarm feature warns you if there is an increase in temperature inside your fridge, he..
Display inte...
Sì
Classe di ef...
E
Livello di r...
Silenzioso: sotto i 35 dB
Capacità con...
68 L
669,90 €
IVA esclusa:549,10 €
Marca: WHIRLPOOL
Stock: 5
Whirlpool WHC20 T573 P, 280 L, No Frost (fridge), 32 dB, 7 kg/24h, D, White
Whirlpool WHC20 T573 P. Total net capacity: 280 L. Door hinge: Right. Noi..
Colore
Bianco
Display inte...
Sì
Classe di ef...
D
Livello di r...
Silenzioso: sotto i 35 dB
791,09 €
IVA esclusa:648,43 €
Marca: WHIRLPOOL
Stock: 14
Whirlpool MaxiSpace W8I HT58 T, Fully built-in, Full size (60 cm), Black, Touch, 1.3 m, 1.55 m
Whirlpool MaxiSpace W8I HT58 T. Appliance placement: F..
Classe di ef...
B
Classe di em...
A
Tipo di lava...
Lavastoviglie da incasso
Coperti
13-14 coperti
579,80 €
IVA esclusa:475,24 €
Marca: WHIRLPOOL
Stock: 24
Whirlpool W55Z1 112W, 95 L, 6.5 kg/24h, SN-T, 35 dB, E, White
Whirlpool W55Z1 112W. Freezer net capacity: 95 L, Climate class: SN-T, Freezing capacit..
Classe di ef...
E
Tipo di cong...
Congelatore a pozzetto
No Frost
No
Capacità con...
95 L
247,21 €
IVA esclusa:202,63 €
Marca: WHIRLPOOL
Stock: 6
Whirlpool WHMFF 6312 W4E, 286 L, 34 dB, E, White
Whirlpool WHMFF 6312 W4E. Fridge net capacity: 286 L, Noise level: 34 dB. Fridge number of shelves/b..
Capacità di ...
250-349 L
Colore
Bianco
Classe di em...
B
Classe di ef...
E
551,66 €
IVA esclusa:452,18 €
Marca: WHIRLPOOL
Stock: 10
WHIRLPOOL Refrigerator WHK 26362 XBR4E, Height 186,5 cm, Energy class E, No frost — Genuine WHIRLPOOL product supplied by DistriNode.Key specification..
Capacità di ...
Meno di 150 L
Colore
Nero
Tipo di frig...
Mini frigo
Caratteristi...
No Frost
504,59 €
IVA esclusa:413,59 €
Marca: WHIRLPOOL
Stock: 5
Whirlpool W5V5LCW, Freestanding cooker, Black, White, Buttons, Rotary, Touch, White, Bottom, Storage drawer
Whirlpool W5V5LCW. Product type: Freestan..
Tipo di cont...
Pulsanti, manopola e touch
Display inte...
Sì
Capacità forno
60 L
Classe di ef...
A
407,93 €
IVA esclusa:334,37 €
Marca: WHIRLPOOL
Stock: 48
Whirlpool AKR 62F LT K, 650 m³/h, Ducted/Recirculating, A, A, D, 65 dB
Whirlpool AKR 62F LT K. Maximum extraction power: 650 m³/h, Type of extraction..
Classe di ef...
A
Numero di ve...
4 velocità
Livello di r...
65 dB
Tipo di capp...
Da parete
226,44 €
IVA esclusa:185,60 €
Marca: WHIRLPOOL
Stock: 23
Air Conditioner Indoor Unit SPICR312WFI — Genuine WHIRLPOOL product supplied by DistriNode.Available with live stock, verified product data, official ..
Tipo di cond...
Unità interna
172,86 €
IVA esclusa:141,69 €
Marca: WHIRLPOOL
Stock: 8
Air Conditioner Indoor Unit 5KW SPICR318WFO — Genuine WHIRLPOOL product supplied by DistriNode.Available with live stock, verified product data, offic..
Tipo di cond...
Unità esterna
419,62 €
IVA esclusa:343,95 €
Marca: WHIRLPOOL
Stock: 17
The Whirlpool WHC18D071A1 is a high-performance built-in fridge-freezer designed to seamlessly integrate into your kitchen while delivering exceptiona..
Colore
Bianco
Classe di ef...
D
Livello di r...
Silenzioso: sotto i 35 dB
Posizione co...
Congelatore in basso
558,67 €
IVA esclusa:457,93 €
Marca: WHIRLPOOL
Stock: 4
The Whirlpool W7IHT40T is a fully integrated dishwasher designed to blend seamlessly into your kitchen cabinetry while delivering exceptional cleaning..
Classe di ef...
C
Classe di em...
B
Tipo di lava...
Lavastoviglie da incasso
Coperti
13-14 coperti
607,87 €
IVA esclusa:498,25 €
Marca: WHIRLPOOL
Stock: 1
Introducing the Whirlpool WHVA 62F LM K wall mounted chimney hood, designed to efficiently remove cooking odors, steam, and grease from your kitchen. ..
Classe di ef...
A
Livello di r...
65 dB
Tipo di capp...
Da parete
Tipo di estr...
Aspirante e filtrante
276,99 €
IVA esclusa:227,04 €
Marca: WHIRLPOOL
Stock: 7
The Whirlpool WPS D8 WBS EE is a front loading heat pump dryer with an 8 kg drying capacity and a white finish. It features a digital display, delayed..
Capacità nom...
8 kg
Sistema di a...
Pompa di calore
551,69 €
IVA esclusa:452,21 €
Marca: WHIRLPOOL
Stock: 3
The Whirlpool WF S7560 NE is a high-performance front-load washing machine designed to deliver exceptional cleaning results while caring for your fabr..
Capacità di ...
7 kg
Classe di ef...
A
Tipo di lava...
Lavatrice a caricamento frontale
Velocità di ...
1500+ RPM
360,59 €
IVA esclusa:295,57 €
Marca: WHIRLPOOL
Stock: 1
Are you tired of hand-washing dishes after every meal, wasting time and water? The Whirlpool W8I HF58 TU UK fully integrated dishwasher takes over the..
Classe di ef...
C
Tipo di lava...
Lavastoviglie da incasso
Coperti
13-14 coperti
Caratteristi...
AquaStop / Protezione antiallagamento
732,86 €
IVA esclusa:600,70 €
Marca: WHIRLPOOL
Stock: 5
Experience exceptional fabric care with the Whirlpool WAM762WBBPL, a freestanding front-load washing machine that combines a 7 kg capacity with a powe..
Capacità di ...
7 kg
Classe di ef...
C
Posizionamen...
A libera installazione
Tipo di lava...
Lavatrice a caricamento frontale
400,18 €
IVA esclusa:328,01 €
Marca: WHIRLPOOL
Stock: 13
The Whirlpool WSD74WBBPL is a front-loading heat pump dryer that combines a 7 kg capacity with A++ energy efficiency, making it a reliable choice for ..
Tipo di disp...
LCD
Classe di ef...
A++
Classe di em...
B
Capacità nom...
7 kg
712,58 €
IVA esclusa:584,08 €
Marca: WHIRLPOOL
Stock: 8
The Whirlpool WOI4S8PM1SB redefines convenience in built-in ovens with its 6th SENSE technology, which automatically adjusts cooking parameters for fl..
Tipo di cont...
Touch
Capacità forno
73 L
Classe di ef...
A+
441,33 €
IVA esclusa:361,74 €
Marca: WHIRLPOOL
Stock: 82
Limited kitchen space and the need for versatile cooking often clash, but the Whirlpool WMF200GNB built-in microwave oven resolves this by combining m..
Display inte...
Sì
Capacità int...
20 L
Tipo di inst...
Integrato
Potenza del ...
700 W
216,23 €
IVA esclusa:177,24 €
Marca: WHIRLPOOL
Stock: 3
Uneven baking, slow preheating, and stubborn grease can turn cooking into a chore. The Whirlpool WOI4S8HM2SWA built-in electric oven tackles these fru..
Capacità forno
73 L
Classe di ef...
A+
426,07 €
IVA esclusa:349,24 €